From idea to handover
Installing a padel court,handled from A to Z
Installing a padel court takes experience and precision. We take care of the whole process: advice and design, foundation and permit, production in our own factory, delivery and installation. Indoor or outdoor, we advise you on location, lighting and finishing.
- Price indication within 2 working days
- Everything from our own factory
- 15-year warranty on the steel structure

The groundwork
First the location, then the court
A stable base is essential. That is why we first check whether the existing ground is suitable. If it is not, we advise on the right build-up: from a sand bed to a water-permeable concrete layer or a ring foundation.
The permit is also part of this phase. We draw the court onto your site and advise you on the permit at your municipality and on noise towards the neighbours, so nothing surprises you later.
That way you know exactly what is needed under and around the court before production starts.
- Sand bed, water-permeable concrete or ring foundation
- Soil survey first, then foundation advice
- Help with the permit and noise

How we work
From request to handover in five steps
Five steps, one point of contact. You know in advance what happens and how long each step takes.
- No-obligation first conversation and price indication
- Production to European standards
- Handover report and maintenance briefing
Within 2 working daysIntroduction and price indication
You fill in the form or call us. In a personal conversation we discuss what you have in mind: indoor or outdoor, how many courts and where. We map out the location and within 2 working days you have a price indication, with no obligation.
2 to 3 weeksSite survey, design and permit
We survey the ground and advise on the foundation. Once the location and specifications are set, we make the design and help you with the permit.
8 to 10 weeksIn-house production
We make the steel structure, glass and fixings in our own factory, to European standards. That keeps lines short and quality consistent, with a 15-year warranty on the steel structure.
2 days per courtDelivery and installation
After production we plan the delivery together. Our experienced installation team fits the steel structure, the glass, the artificial turf and the LED lighting: 2 days per court.
After installationHandover and maintenance
We inspect the court together with you. You receive a handover report and an explanation of the maintenance, so your courts last for years, technically and visually.
Timeline
The process at a glance
Average lead time of a padel project, from the first conversation to the final check.
| Start | What happens | Average duration |
|---|---|---|
| Week 1 | Introductory conversation, wishes and site analysis | 1 week |
| Week 2 | Soil survey and foundation advice | 2 to 3 weeks |
| Week 4 | Steel structure, glass and preparation of the installation | 8 to 10 weeks |
| Week 12 | Installation of courts, lighting and finishing | 2 to 3 weeks |
| Week 14 | Final check and handover document | 1 week |
The start weeks are averages and differ per project. Installing one court takes 2 days; in a project with several courts, lighting and finishing come on top of that.
Why I-Padel
Why leave the installation to us
You work directly with the manufacturer. You notice that in every step of the process.
- Own production in the NetherlandsNo intermediaries or foreign factories: everything comes from our own factory.
- 15-year warrantyOn the steel structure of every court we build.
- Complete peace of mindAdvice, design, foundation, production and installation: all from a single source.
- Fast delivery timesThanks to our stock and efficient production.
- Custom work possibleFrom panorama courts to single courts, to suit your location.
- Maintenance tooAfter handover we can also take care of the maintenance of your courts, including replacing the artificial turf.
Costs
What installing a padel court costs
An indoor padel court starts at € 23,000, an outdoor padel court at € 30,000. A complete outdoor court, including foundation, starts at € 50,000. All prices exclude VAT.
The foundation is the biggest variable: expect € 20,000 to € 40,000, depending on the ground. You can read exactly what is involved at what an indoor padel court costs and what an outdoor padel court costs.
Considering a complete indoor location? Then a steel padel hall with courts inside is often the best choice.
- Indoor from € 23,000, outdoor from € 30,000
- Outdoor complete, including foundation, from € 50,000
- All prices exclude VAT

Frequently asked questions
Questions about installing a padel court
Is your question not listed? Call us and you will get an answer straight away.
How long does installing a padel court take?
The timeline above shows that the final check starts on average in week 14 after the first conversation. Production takes 8 to 10 weeks, installation 2 days per court. For a project with several courts, including lighting and finishing, the installation phase takes 2 to 3 weeks.
Do I need a permit for a padel court?
That differs per municipality and per location. That is why we include the permit in the design phase: we draw in the court, help you with the application at your municipality and advise on noise measures towards the neighbours.
What foundation does a padel court need?
A stable, level base: a sand bed, a water-permeable concrete layer or a ring foundation, depending on the ground. We first check whether an existing surface can be used. Expect € 20,000 to € 40,000 for the foundation, excluding VAT.
What does installing a padel court cost?
An indoor padel court from € 23,000, an outdoor padel court from € 30,000 and a complete outdoor court including foundation from € 50,000, excluding VAT. To find out what it will be for your location, request a price indication: you will have it within 2 working days.
Can I convert an existing tennis court into padel courts?
Yes. One tennis court fits two to three padel courts. We check whether the existing surface can be used as a base and include the conversion in the price indication. Read more at converting a tennis court into a padel court.
Knowledge base
More about building a padel court
Foundations, permits, noise and installation: our articles go deeper into every step.
Building a padel court · 24 August 2026What misconceptions exist regarding noise nuisance at padel?Noise nuisance in padel: 7 common misconceptions debunked with technical substantiation. Discover what is really true regarding standards and measures.
Building a padel court · 18 August 2026When is padel noise perceived as a nuisance?Padel noise already reaches 91 dB — 10 dB more than tennis. Discover which standards apply, when an inspection is mandatory, and which measures prevent nuisance.
Building a padel court · 30 May 2026Does an indoor padel court cause noise nuisance to the surrounding area?Indoor padel court and noise pollution? Discover the standards (91 dB), legal regulations, and smart measures to prevent complaints.