Building a padel court · 11 June 2026 · 11 min read
What are the most common mistakes when building a padel court?
Avoid expensive mistakes when building a padel court. From foundation to hidden costs: find out what you really need to know before you start.

In this article
- Which mistakes are made most often when building a padel court?
- Why is a wrong foundation such a big mistake with a padel court?
- What goes wrong if you do not have a structural calculation made for each site?
- How do you choose a reliable contractor for a padel court?
- What are the hidden costs when building a padel court?
- When are sound-absorbing panels mandatory for a padel court?
- Which warranties should you demand when buying a padel court?
- Frequently asked questions
Building a padel court seems simpler than it is. You choose a location, request a quote and a few weeks later you are playing. Unfortunately, that is rarely how it goes in practice. Many clients run into the same problems: a foundation that is not up to standard, a structure that does not suit the site, or costs that turn out much higher than expected. In this article, we list the most common mistakes so that you can avoid them.
Which mistakes are made most often when building a padel court?
The most common mistakes when building a padel court are a wrong or undersized foundation, no structural calculation per site, insufficient attention to noise requirements, choosing a contractor purely on price and underestimating hidden costs. Each of these mistakes can lead to higher costs, delays or a court that does not meet the requirements.
What stands out is that most mistakes are not made during construction itself, but in the preparation. Anyone who decides too quickly without asking the right questions pays the price later. Below, we discuss each mistake separately, with practical advice on how to approach it better.
Why is a wrong foundation such a big mistake with a padel court?
The foundation determines the stability, lifespan and playing quality of a padel court. A wrong or too light foundation leads to settlement, tilting of the cage structure and damage to the artificial turf. In the worst case, the court has to be rebuilt after just a few years, which more than cancels out the initial saving.
There are three commonly used foundation types, each with its own characteristics:
- Drainage concrete is a water-permeable type of concrete in which rainwater drains directly through the foundation into the ground. Suitable for outdoor sites with good soil conditions. Average lifespan: 25 to 40 years.
- Supersub is a foundation solution based on foam concrete. It is light, self-levelling and shock-absorbing. In its outdoor version, Supersub is water-permeable and can be poured within a single day. Particularly suitable for converting existing sports fields.
- ZOAB asphalt (very open asphalt concrete) is a porous type of asphalt that lets water through. Less common for padel, but in certain situations a good choice.
The mistake that is regularly made: choosing the cheapest foundation type without taking the soil conditions into account. Without a cone penetration test in advance, you simply do not know what the soil can handle. Foundation advice based on cone penetration test data is not a luxury, but a necessary step. In the Netherlands, all foundation components must moreover be inspected by Kiwa ISA Sport. Anyone who works with non-certified materials risks the court later not qualifying for official matches or inspections.
What goes wrong if you do not have a structural calculation made for each site?
Without a structural calculation per site, you run the risk that the steel structure is not tailored to the specific conditions of your site. Think of wind load, soil conditions, surrounding buildings and any noise requirements. A standard structure that works well at site A may be unsafe or unsuitable at site B.
This is a particular problem with:
- Open sites or coastal locations with higher wind load
- Sites with deviating dimensions or limited height (indoor)
- Courts where sound-absorbing panels are used
That last point deserves extra attention. Sound-absorbing panels are placed on the outside of the mesh of the cage structure. They reduce the wind permeability of the structure, which increases the wind load on the court. The structure must therefore be structurally reinforced, with heavier posts, additional columns or modified connections. Anyone who skips this builds a court that does not meet the safety requirements and can cause problems in strong winds.
Importers and standard suppliers generally do not offer customisation at this level, certainly not for smaller numbers of courts. A site-specific calculation is therefore one of the points you should explicitly ask about when requesting a quote.
How do you choose a reliable contractor for a padel court?
You can recognise a reliable contractor for a padel court by three things: transparency about what is included, demonstrable experience with the complete process from foundation to handover, and the willingness to make a structural calculation per site. A party that only names a price without a specification gives you insufficient basis for comparison.
When selecting a contractor, pay attention to the following points:
- Does the contractor deliver everything from a single source? Many parties are in fact coordinators who manage various suppliers. If something goes wrong, the question of who is responsible quickly becomes a problem.
- Does the contractor work with certified materials? Foundation components and artificial turf must be inspected by Kiwa ISA Sport in the Netherlands. Ask about this explicitly.
- Does the contractor make a site-specific structural calculation? This is a technical obligation, not an extra service.
- How long is the warranty on the steel structure? This says a lot about the confidence a supplier has in their own product.
- Can the contractor show references from comparable projects? Ask about courts that have been in use for several years.
Also look at the origin of the steel structure. Many Dutch providers import their courts from Spain. That brings transport costs, longer delivery times and less flexibility for customisation. A manufacturer that makes the structure itself has more control over quality and scheduling.
What are the hidden costs when building a padel court?
The hidden costs when building a padel court lie mainly in the foundation, the permit process, noise measures and additional civil works. Anyone who looks only at the price of the superstructure has an incomplete picture of the total investment.
Concrete cost items that are often underestimated:
- Foundation: For outdoor padel courts this is the biggest cost item. Foundation costs are on average between €20,000 and €40,000, depending on soil conditions, accessibility and the civil works required.
- Permit process: An environmental permit takes time and money. Think of acoustic study, lighting study, structural calculations and site drawings. The lead time is on average 8 to 12 weeks.
- Noise measures: If the site is near homes, sound-absorbing panels or a noise barrier may be mandatory. These are separate cost items that are not included as standard in a basic quote.
- Groundwork and drainage: Not every site is ready for building. Earthmoving, drainage and levelling can raise the costs considerably.
- Inspection after handover: For official matches, an inspection by Kiwa ISA Sport is mandatory. This is a separate step that is sometimes forgotten in the planning.
As an indication, a standard indoor padel court is possible turnkey from approximately €23,000 per court. An outdoor padel court including foundation starts on average from approximately €50,000. The exact price always depends on the specific situation, the number of courts and the site conditions.
When are sound-absorbing panels mandatory for a padel court?
Sound-absorbing panels are not legally mandatory, but in practice municipalities increasingly make them a condition when granting permits. This applies in particular to sites near residential areas, where padel produces more noise than tennis, with an average sound power level of approximately 91 dB, around 10 dB more than tennis.
When do you come across noise measures in the permit process?
- If the padel court is placed outdoors near homes
- If the municipality makes an acoustic study mandatory
- If local residents object during the permit procedure
- If the court wants to apply longer opening hours, including in the evening
Sound-absorbing panels are placed on the outside of the mesh. They absorb the sound instead of reflecting it back, while the playing dynamics are preserved. Independently tested in an acoustic laboratory, this results in an airborne sound insulation of 22 dB and a noise reduction that is audible at distances of 40 to 100 metres.
Important: as soon as panels are used, the cage structure must be structurally reinforced. This is not optional. The panels reduce the wind permeability of the structure, which increases the wind load. A structural engineer must recalculate and adapt the court. In some cases a combination of panels and a freestanding noise barrier is the most effective, where the barrier can be built lower thanks to the contribution of the panels.
Which warranties should you demand when buying a padel court?
When buying a padel court, you should at the very least demand a warranty on the steel structure, clarity about the warranty terms for the artificial turf and the LED lighting, and assurance that the materials used are certified in accordance with Dutch standards. A supplier who does not explicitly commit on this gives you insufficient certainty for an investment that has to last for decades.
Concrete questions you should ask:
- How long is the warranty on the steel structure, and what are the exact terms?
- What warranty applies to the artificial turf and the coating of the structure?
- Have the foundation components and the artificial turf been inspected by Kiwa ISA Sport?
- Who is the point of contact for warranty claims: the supplier or a third party?
- What is the procedure if damage occurs within the warranty period?
A long warranty period on the steel structure, such as 15 years, is a strong indication that a supplier has confidence in the quality of their own production. Do note that warranties can differ per component. The warranty on the steel structure does not usually apply automatically to the coating, the artificial turf or the LED lighting. Always ask for the warranty terms in writing, per component.
We are happy to think along with you, without obligation, about your project. Whether you want to realise an indoor site or build an outdoor court, at I-Padel we take care of the complete process from A to Z, from foundation advice to handover. Take a look at our approach on the page about building padel courts or get in touch directly for an initial exploration.
Frequently asked questions
How long does it take on average to build a padel court from start to finish?
The total lead time of a padel court project is on average between 3 and 6 months, depending on the complexity of the site. The permit process alone takes on average 8 to 12 weeks. Also allow time for the cone penetration test, structural calculation, material delivery and the actual construction. So start the process early enough, especially if you have an opening date in mind.
What is a cone penetration test and do I really need to have one carried out before I start?
A cone penetration test is a soil investigation in which the bearing capacity and composition of the subsoil are mapped. This is an absolute necessity before choosing a foundation type, because without this data nobody knows what the soil at your specific site can handle. A cone penetration test costs relatively little, but prevents costly foundation mistakes that can cost tens of thousands of euros to repair later.
Can I convert an existing sports field or tennis court into a padel court?
Yes, that is certainly possible and in many cases even advantageous. Existing paving can sometimes serve as the base, provided the subsoil has sufficient bearing capacity and is in good condition. Supersub is a particularly suitable foundation solution for this, because it is light, self-levelling and shock-absorbing and can be poured within a day over existing substrates. Always have an inspection carried out first to assess whether the existing paving is suitable.
What happens if I use non-certified materials for my padel court?
If you use materials that have not been inspected by Kiwa ISA Sport, you risk the court not qualifying for official matches or mandatory inspections after handover. It can also cause problems with warranty claims and can undermine the value of your investment in the long term. With every contractor or supplier, always explicitly ask for proof of Kiwa ISA Sport certification for both the foundation components and the artificial turf.
How many padel courts do I need to build to make the project profitable?
The minimum scale for a profitable padel complex depends on your business model, site costs and target group, but in practice people often start with at least 2 to 4 courts to generate sufficient playing capacity and revenue. With more courts, the average cost per court falls, partly because foundation, permit and connections can be organised more efficiently. Have a financial feasibility analysis made before you finalise the number of courts.
What common mistake is made when requesting quotes for a padel court?
The most common mistake is comparing quotes that are not based on the same scope. One quote contains only the superstructure, while another also covers foundation, lighting and permit support. Always ask for an itemised turnkey quote in which all cost items are listed separately, including foundation, civil works, lighting, noise measures and inspection after handover. Only then are you comparing like with like.
Is it wise to choose a contractor who produces the structure itself rather than importing it?
In most cases it is, because an in-house producer has more control over quality, customisation and delivery times. Importers depend on foreign manufacturers, which can lead to longer lead times, higher transport costs and less flexibility for site-specific modifications such as reinforced structures for sound-absorbing panels. A producer that manufactures itself can also respond faster to warranty claims or modifications after handover.