Building an indoor padel court? The minimum clear height is 6 metres. Discover what this means for your location and what else is involved.

In this article
- What happens if the clear height is just too low?
- How much clear height is needed at minimum for an indoor padel court?
- Does the required height differ per type of padel court?
- Which other dimensions are decisive besides height?
- How do you measure the usable clear height correctly?
- What if the space just falls short of the minimum height?
- What questions should you ask before choosing a location?
- How I-Padel helps you assess your location
- Frequently asked questions
The minimum clear height for building an indoor padel court is 6 metres. This is the lower limit at which a court is technically feasible and the game can be played normally. For professional use or competitive sport: the more space above the court, the better the playing quality. In this article we answer the most frequently asked questions about height, space and site suitability for an indoor padel court.
What happens if the clear height is just too low?
If the clear height falls below 6 metres, you run into immediate problems: the steel structure barely fits, if at all, and players hit the structure or the ceiling with high balls. This makes the court unplayable or dangerous, and in practice unmarketable as a commercial venue.
In concrete terms, a hall that is too low means the cage structure cannot be installed at standard height. Some manufacturers offer a lowered version, but this has direct consequences for the playing experience. High lobs, smashes and defensive play along the back wall become impossible or restricted. Players find the space cramped and the ball behaves differently than on a regular court.
A hall that is too low can also affect the LED lighting. Fittings must be placed at the right height to light the playing area evenly without glare. In a low hall the margin is smaller and the lighting solution requires extra attention.
How much clear height is needed at minimum for an indoor padel court?
The minimum recommended clear height for an indoor padel court is 6 metres, measured from the floor to the lowest obstacle above the playing area. This applies to the entire surface of the court, including the run-off zones at the sides.
The 6 metres is not an arbitrary figure. The cage structure of a standard padel court is 4 metres high at the side walls and rises towards the back wall. Above that, space is needed for the installation itself, the LED lighting and a safety margin for play. At exactly 6 metres the situation is technically feasible, but there is little leeway.
For venues where tournaments or competition are also played, a clear height of 7 metres or more is more comfortable. This gives more room for high balls and offers better options for the lighting installation and any camera or scoreboard mounting.
Does the required height differ per type of padel court?
Yes, the type of padel court affects the space requirements, but the minimum clear height of 6 metres applies to all common types. The distinction lies mainly in the structural build-up and the visual appearance, not in the height required above the playing area.
A Pro court has a closed back wall of glass and mesh, while a Panorama court has a fully open back with glass over the full height. Both types require the same minimum clear height. What does differ is the impact on daylight and the way LED lighting is positioned. With a Panorama court, ambient lighting plays a greater role.
For a Single court, a more compact variant that requires less width, the same height requirements apply. Here the width of the hall is the limiting factor, not the height.
Which other dimensions are decisive besides height?
Besides clear height, the floor area and the width of the hall are the most decisive factors. A standard padel court has a playing size of 20 by 10 metres. For installation you need at least 21 by 11 metres. The recommended space including run-off zones is 21 by 14 metres.
Those run-off zones are not a luxury. They provide safety behind the back wall and along the sides, and are also practically needed by the installation team during construction. With multiple courts next to each other, the space in between also counts: courts that are too close together restrict freedom of movement and increase the risk of collisions between players on adjacent courts.
There are also points of attention such as the position of columns, roof structures or skylights in the hall. A column right in the run-off zone can make a location unsuitable or call for an adapted layout. It is wise to have the complete floor plan of the hall assessed before you decide on a final layout.
How do you measure the usable clear height correctly?
You measure the usable clear height from the finished floor to the lowest obstacle located above the playing area. This can be a roof beam, a skylight, a ventilation duct or a light fitting. Measure at several points, because a hall is rarely equally high everywhere.
Pay attention to the following points when measuring:
- Measure at the corner points of the planned court and in the middle, not only at the entrance or along the walls.
- Take into account hanging installations such as sprinklers, cameras or air handling units that will be added later.
- Check whether the floor is completely flat or will still get a screed or foundation, because that reduces the effective height.
- Also note the height of any skylights or roof lights, because they can affect the structure.
An accurate survey prevents surprises during construction. Anyone who has the location assessed by an experienced party immediately gains insight into whether the space is suitable and which modifications may be needed.
What if the space just falls short of the minimum height?
If the clear height is just under 6 metres, there are sometimes still options, but they always require a structural assessment per location. A lowered cage structure is technically possible, but affects the playing experience and must meet the structural requirements for wind load and stability.
In some cases the floor offers a way out. If the hall has a thick existing floor that can be lowered or replaced by a thinner foundation solution, the space gains a few centimetres. Supersub, a foundation solution based on foam concrete, can be applied in a renovation from a thickness of approximately 10 centimetres, which requires less space than traditional concrete floors.
Another option is adjusting the layout. If the court can be shifted somewhat to a part of the hall with more height, the location may still be suitable. This calls for an accurate floor plan analysis and sometimes a creative approach to the layout.
What is never wise: placing a court in a space that is structurally too low without structural modification. The safety of players and the lifespan of the structure are then under pressure.
What questions should you ask before choosing a location?
Before you finally choose a location for building an indoor padel court, there are a number of concrete questions you should be able to answer. A location that seems suitable at first glance may, on closer inspection, have limitations that make realisation more expensive or even impossible.
Ask yourself the following questions:
- What is the clear height at all points above the planned playing area, including obstacles such as beams and pipes?
- Is the floor area at least 21 by 11 metres per court, and is there space for run-off zones?
- Are there columns or other obstacles in the playing zone or the run-off zones?
- What is the condition of the existing floor, and is a new foundation needed?
- Is the hall easily accessible for transport and installation of the steel structure?
- Do fire safety rules or usage rules apply that affect the layout?
- Is there enough electrical capacity for the LED lighting?
Anyone who answers these questions in advance prevents costly surprises during construction. Realising an indoor padel court always starts with a good site assessment. You can find more information about the costs and everything that is involved in our overview of the cost of an indoor padel court.
How I-Padel helps you assess your location
We assess locations on all relevant factors at once: clear height, floor area, foundation options, accessibility and structural feasibility. We don't do this on the basis of a standard checklist, but on the basis of a structural calculation per location. Every hall is different, and tailor-made advice prevents you from facing unexpected costs later.
What we do for you:
- Site assessment on height, area and structural feasibility.
- Advice on the most suitable type of padel court for your space.
- Structural calculation of the steel structure, tailored to the specific conditions of the location.
- Advice on the most suitable foundation solution, such as drainage concrete, Supersub or ZOAB asphalt.
- Complete realisation of the court from A to Z, including foundation, structure, glass, artificial turf and LED lighting.
Unsure whether your location is suitable, or want to know what the possibilities are? Get in touch for an initial exploration and we will be happy to think along with you, without obligation.
Frequently asked questions
How many courts fit next to each other in a standard sports hall?
This depends on the width of the hall and the desired run-off zones. For one court you need at least 11 metres of width, but 14 metres is recommended. For two courts next to each other, you should therefore allow at least 22 metres, plus a gap of at least 1 to 2 metres for safety and freedom of movement. An accurate floor plan analysis is essential to determine how many courts are feasible without compromising safety or playing comfort.
Can you place a padel court in a hall with a sloping roof or uneven ceiling height?
That is possible, but it requires a careful placement strategy. The minimum clear height of 6 metres must be guaranteed over the entire surface of the court, including run-off zones. With a sloping roof it is sometimes possible to position the court so that the highest part of the roof falls above the playing area. A structural assessment per location is indispensable in this case.
What are the most common mistakes when choosing a location for an indoor padel court?
The most common mistake is measuring at only one point in the hall, so that obstacles such as roof beams, pipes or sprinklers are overlooked. Another common mistake is underestimating the impact of columns in the run-off zones. Finally, many people forget to account for the height lost to a new screed or foundation layer, which can reduce the effective clear height by a few centimetres.
Is an existing concrete floor always suitable as a base for a padel court?
Not always. An existing concrete floor must be flat, stable and have sufficient load-bearing capacity to carry the structure and intensive use. Cracks, settlement or insufficient load-bearing capacity can cause problems. In many cases a new top layer is applied, such as drainage concrete or Supersub, to guarantee the right playing quality and drainage. Always have the condition of the existing floor assessed before you make a decision.
What electrical capacity do you need for the LED lighting of an indoor padel court?
For a standard indoor padel court with professional LED lighting you generally need a connection of at least 3 x 25 amperes per court, depending on the chosen lighting system and the number of fittings. It is wise to have the electrical capacity of the hall checked in advance by an electrical engineering consultant. Insufficient capacity can lead to extra costs for upgrading the connection, which affects the total investment.
On average, how long does it take to realise an indoor padel court from the site assessment?
From site assessment to a court ready to play takes between 3 and 6 months on average, depending on the condition of the location, the permits required and the complexity of the foundation. The actual construction time for the structure itself is relatively short, but preparatory work such as foundation construction and any modifications to the hall take the most time. Starting the site assessment and permit application early therefore saves considerable time.
Are permits needed for placing an indoor padel court in an existing building?
In many cases an environmental permit or building notification is required, especially if structural changes are made to the building or the function of the space changes. The exact requirements differ per municipality and per situation. It is wise to check this early with the local municipality, so that permit procedures do not cause delays in the planning. An experienced realisation partner can guide you through this and usually knows which documentation is needed.