Building a padel court requires more than just a good idea—it demands experience, precision, and quality. At I-Padel, we handle the entire process: from consultation and design to production, delivery, and installation. As a Dutch manufacturer of high-quality padel courts, we ensure that every court meets the highest quality standards.
Whether it’s an indoor or outdoor project, we’ll guide you from start to finish, collaborating with you on location, permits, foundations, lighting, and finishing.
Our working method step by step
1. Orientation & first contact
We start with a personal consultation to discuss your needs. Do you want an indoor or outdoor track? How many tracks do you have in mind? We’ll map out the location and provide an initial cost estimate.
💡 Curious about the costs? Read all about the cost of an outdoor padel court here.
2. Site survey & foundation
A stable foundation is essential. That’s why we’ll work with you to determine whether the existing subsurface is suitable. If not, we’ll advise you on the correct construction – from a sand pack to a permeable concrete layer or ring foundation.
📎 Want to know more about the right foundation? Check out our page on foundations and surfaces for padel courts.
3. Design & production
Once the location and specifications have been determined, we begin design and production in our own factory in the Netherlands. Here, we produce everything in-house: steel structures, glass, and fasteners – fully compliant with European standards and with a 15-year warranty.
4. Delivery & installation
After production, we’ll plan delivery and installation together. Our experienced installation teams ensure a flawless installation – from placing the steel structure to laying the artificial grass and installing the LED lighting.
5. Delivery & maintenance
After installation, we’ll inspect the court with you. You’ll receive a final report and maintenance instructions, ensuring your padel courts last for years – both technically and visually.
Timeline: the journey at a glance
Fase | Description | Average duration |
1. Orientation & advice | Introductory meeting, wishes & location analysis | 1 week |
2. Technical preparation | Soil research & foundation advice | 2–3 weeks |
3. Design & production | Steel construction, glass and installation preparation | 8–10 weeks |
4. Transport & assembly | Installation of tracks, lighting & finishing | 2–3 weeks |
5. Delivery | Final inspection & delivery document | 1 week |
Why choose I-padel?
- Own production in the Netherlands – no intermediaries or foreign factories.
- 15-year warranty on steel structures and glass.
- Complete care: from design to delivery.
- Fast delivery times thanks to our stock and efficient production.
- Customisation possible – from panoramic tracks to single tracks.
Considering a fully indoor venue? Then also read our article: Why a steel hall is the best choice for your padel project.Waarom een stalen hal de beste keuze is voor jouw padelproject.
Are you ready to start your padel project?
Contact us for a no-obligation consultation. We’ll explore the possibilities together, create a suitable proposal, and schedule a site visit if desired.
📞 Call us directly or 📩 Fill out the contact form – we will contact you within one business day.